top of page

WP 3

Work Package 3 Leader: Dr. Christoph Greb, RWTH Aachen University (ITA), Germany

Task 3.1. Short-term staff exchanges and expert visits for acquaintance with know-how and acquisition of experience in the field of processing of technical textile structures. (Month 12-Month 21)

Task Leader: RWTH Aachen University (ITA)

​

Under the short-term staff exchange framework three researchers from Lodz University of Technology and one researcher from each partner institute (University of Boras and University of Zaragoza) will conduct research work at RWTH Aachen University from January 2024 to February 2024.

​

​

Task 3.2. Training on processing of technical textile structures for business and science community. (M17 - M22)

Task Leader: RWTH Aachen University (ITA)

​

Scientists from RWTH Aachen University will organize a training on processing of technical textile structures for business and science community in April/May 2024.

​

​

Task 3.3. Workshop and lectures on basic aspects and metrology methods for physical characterization of technical textiles for Early-Stage Researchers (ESRs) of Lodz University of Technology, Faculty of Material Technologies and Textile Design(FMTTD). (M17 - M24)

Task Leader: Lodz University of Technology (TUL)

​

Scientists from Lodz University of Technology will organize workshop and lectures on basic aspects and metrology methods for physical characterization of technical textiles for Early-Stage Researchers (ESRs) of Lodz University of Technology, Faculty of Material Technologies and Textile Design in April/May 2024.

Creation of the Joint Research and Innovation Road Map as a
pivoting component of the project results sustainability.

​

_________________________________

connected with WP2 and WP4

​

Sustainable development aspects in
production of innovative Textile
Reinforcement Composites: CA measures.

​

_________________________________

connected with WP1, WP3, WP5, WP6 and WP7

Maximizing the TUL research visibility and outreach:
dissemination, exploitation and communication.

​

_________________________________

connected with WP2 and WP4

​

Industrial design - new approach to
composite products: CA measures
.

 

 

 

_________________________________

connected with WP1, WP3, WP5, WP6 and WP7

Design and realization of dedicated composite reinforcements
considering the aspects of sustainable development.

​

_________________________________

connected with WP2, WP3, WP4 and WP6 

Project management and coordination.

​

​

​

_________________________________

connected with WP1-WP7

​

Design and processing of technical textile structures for the
reinforcement composites: CA measures.

​

_________________________________

connected with WP1, WP2, WP4 and WP5

​

Strengthening TUL research management, administrative
skills and building the necessary capacity to allow successful
participation in R&l projects.

_________________________________

connected with WP2, WP4 and WP5

​

tul_logo.jpg
RWTH Aachen.jpg
boras v2.png
Zaragoza logo.png
Wademekum.png
bottom of page